Here are some projects that i worked on that can be publicly displayed. If you are interested in seeing more examples, please contact me at: This email address is being protected from spambots. You need JavaScript enabled to view it.
VIDEO
Demoreel
0:07 - 0:10 - Realflow simulation, texture/light/render, compositing (inflex project)
0:10 - 0:15 - Realflow simulation, compositing (maytag dishwasher project)
0:15 - 0:51 - Partial 3d modeling/texturing, complete render/geometry optimization, lighting,compositing, MEL scripting (L5 Pilot Episode)
0:51 - 0:56 - Turkey modeling/texturing(zbrush) (Maytag oven project)
0:56 - 0:59 - Modeling, Texture, MEL Script Animation, Render, compositing(molecular visualization )
0:59 - 1:01 - Modeling(Maya) (EAT 3D Contest)
1:01 - 1:05 - High Detail modeling, UV Layout (3D Max) (commercial/brochure)
1:05 - 1:12 - Realflow simulation, Cinema 4D material development (Whirlpool project)
1:12 - 1:26 - Digital-Tutors - Creative Development - Series of video lessons.
VIDEO
L5 Release Trailer
Technical Director on the project.
Responsible for rendering pipeline (Mental Ray and V-ray)
Asset management
Partial modeling(fixing)
Troubleshooting minor/major problems with scenes and geometry/shaders/textures
Developed a series of in-house scripts/tools (MEL/Python)
Look development, worked closely with Creative Director
Render management and configuration.
Assisted with tracking on several shots.
Managed 2 teams of artists (tracking / 3D modeling/animation).
Handled team communication and updates.
VIDEO
L5 - Series: Argo shot breakdown
Lighting setup.
Material setup (mental ray shaders)
Optimized geometry to reduce render time
Troubleshooted technical aspects of geometry
Created render setup/configuration with break down to render passes
Rendered with Mental Ray for Maya.
Assisted with compositing and mics. image corrections.
VIDEO
Molecular Visualization
Created 3D molecule using Molecular Maya plug-in.
Converted produced particle system to high-res geometry
Adjusted shaders (mental ray).
Animation was done via MEL scripting, then baked to key frames
Render layers setup: Diffuse, Occlusion, Reflection.
Post production and motion graphics in After Effects.
Completing time - 2 days including rendering.
VIDEO
Muscle Chopper - Eat 3D
Model is created in Maya for Eat3D High Poly Modeling Challenge. Forum: Contests and Challenges: Entry thread
Original design
Used reference images to help me with the development
Consulted professional mechanics in order to deliver proper mechanics
Completed in 120 hours, and consists of 2.6 mil polygons
VIDEO
Modeling Tutorial Summary
This time lapse video, of an original 8 hour session, was recorded as educational material for IADT-Chicago. I held the 3 day lecture, where I taught modeling techniques and logical workflow to graduate students.